Project Location: East Village, London / U.K. Project Definition: Erection of Steel Structure Owner: Mace Contractor: Metal Yapi Duration: 4 months/ 2017 Scope of Work: Desa scope covers erection of 750 tons of steel structure. The project aims to construct two high rise residential towers using a new concept in the U.K. market. The scheme uses a temporary steel rising factory erected over the top of each residential tower during the construction. After each floor has been constructed, the temporary steel 'rising factory' is lifted, allowing the next floor to be built. |