PROJECTS | COMPLETED PROJECTS
Braila Suspended Bridge (Romania)
Project Location: Braila, Romania
Client: CNAIRSA
Contractor: ASTALDI SpA & IHI Infrastructure Systems CO. LTD Association
Duration: 18 Months / 2019 - 2021
Scope of Work: Execution of Structural Concrete and Steel Works
Details: Anchor Blocks, Tower Foundations and Tower Elevations Approach Viaduct Foundations and Approach Viaduct Elevations
Client: CNAIRSA
Contractor: ASTALDI SpA & IHI Infrastructure Systems CO. LTD Association
Duration: 18 Months / 2019 - 2021
Scope of Work: Execution of Structural Concrete and Steel Works
Details: Anchor Blocks, Tower Foundations and Tower Elevations Approach Viaduct Foundations and Approach Viaduct Elevations
ONE Verdi Park (Romania)
Project Location: Bucharest, Romania
Client: ONE United
Contractor: DESA
Duration: 17 Months / 2020-2021
Scope of Work: Execution of Structural Concrete Works
Details: 3 Underground Floors, One 16-Storey High Office Tower, One 19-Storey High Residential and
Commercial Ground Floor 60.000 sqm Construction Area
Client: ONE United
Contractor: DESA
Duration: 17 Months / 2020-2021
Scope of Work: Execution of Structural Concrete Works
Details: 3 Underground Floors, One 16-Storey High Office Tower, One 19-Storey High Residential and
Commercial Ground Floor 60.000 sqm Construction Area
Hooge Steenen, Parkblok (The Netherlands)
Project Location: Utrecht, The Netherlands
Contractor: HURKS
Duration: 10 Months / 2020-2021
Scope of Work: Execution of Structural Concrete Works and Placement of Prefabricated Concrete Elements
Contractor: HURKS
Duration: 10 Months / 2020-2021
Scope of Work: Execution of Structural Concrete Works and Placement of Prefabricated Concrete Elements
2AMSTERDAM (The Netherlands)
Project Location: Amsterdam / The Netherlands
Project Definition: Redevelopment and Renovation of Two Office Towers
Owner: Provast commissioned by Commerz Real
Contractor: JP van Eesteren / TBI
Duration: 17 Months / 2019-2020
Scope of Works: Desa scope covers the installation and dismantling of shoring and formwork materials.
Project Definition: Redevelopment and Renovation of Two Office Towers
Owner: Provast commissioned by Commerz Real
Contractor: JP van Eesteren / TBI
Duration: 17 Months / 2019-2020
Scope of Works: Desa scope covers the installation and dismantling of shoring and formwork materials.
Trudo Tower (The Netherlands)
Project Location: Eindhoven / The Netherlands
Project Definition: Construction of a Residential Tower
Owner: Sint Trudo
Contractor: Stam & de Koning
Duration: 17 Months / 2019-2020
Scope of Works: Desa scope covers the execution of all concrete works on 19 storey tower.
Project Definition: Construction of a Residential Tower
Owner: Sint Trudo
Contractor: Stam & de Koning
Duration: 17 Months / 2019-2020
Scope of Works: Desa scope covers the execution of all concrete works on 19 storey tower.
Mall of The Netherlands (The Netherlands)
Project Location: Leidschendam / The Netherlands
Project Definition: Shopping Mall
Owner: Unibail-Rodamco-Westfield (URW)
Contractor: Ballast Nedam
Duration: 12 Months / 2018
Scope of Works: Desa scope covers the execution of formwork, concrete casting, and placement of precast units in parking block (43,000m²).
Project Definition: Shopping Mall
Owner: Unibail-Rodamco-Westfield (URW)
Contractor: Ballast Nedam
Duration: 12 Months / 2018
Scope of Works: Desa scope covers the execution of formwork, concrete casting, and placement of precast units in parking block (43,000m²).
U.S. Embassy Berlin (Germany)
Project Location: Berlin / Germany
Project Definition: Embassy of the United States of America
Owner: U.S. Bureau of Overseas Building Operations
Contractor: Pernix Germany GmbH
Duration: 16 Months / 2018 – 2019
Scope of Work: Desa scope covers major rehabilitation works, modernization of campus security and planning Marina Security Guard Headquarters for the U.S. Embassy.
Project Definition: Embassy of the United States of America
Owner: U.S. Bureau of Overseas Building Operations
Contractor: Pernix Germany GmbH
Duration: 16 Months / 2018 – 2019
Scope of Work: Desa scope covers major rehabilitation works, modernization of campus security and planning Marina Security Guard Headquarters for the U.S. Embassy.
U.S. Embassy Colombo (Sri Lanka)
Project Location: Colombo / Sri Lanka
Project Definition: Embassy of the United States of America
Owner: U.S. Bureau of Overseas Building Operations
Contractor: Caddell Construction Co., Inc.
Duration: 24 Months / 2015-2018
Scope of Work: Desa scope covers design and construction of a U.S. Embassy Campus that includes a new office building, residential navy, and access control facilities for the center of the campus. The project will include main access design, welcoming squares, paved terraces, etc.
Project Definition: Embassy of the United States of America
Owner: U.S. Bureau of Overseas Building Operations
Contractor: Caddell Construction Co., Inc.
Duration: 24 Months / 2015-2018
Scope of Work: Desa scope covers design and construction of a U.S. Embassy Campus that includes a new office building, residential navy, and access control facilities for the center of the campus. The project will include main access design, welcoming squares, paved terraces, etc.
Mons Railwaystation (Belgium)
Project Location: Mons / Belgium
Project Definition: Erection of Steel Structure
Owner: Eurogare
Contractor: S.M. Cit Blaton-CFE-BPC Hainaut, Metal Yapi
Duration: 11 months / 2016 – 2017
Scope of Work: Desa scope covers the steel structure works for the footbridge-gallery of the station, providing a link between the two districts of Mons City Center and the Grands Prés site. This gallery includes business spaces and offices (+/- 2500 m²).
Project Definition: Erection of Steel Structure
Owner: Eurogare
Contractor: S.M. Cit Blaton-CFE-BPC Hainaut, Metal Yapi
Duration: 11 months / 2016 – 2017
Scope of Work: Desa scope covers the steel structure works for the footbridge-gallery of the station, providing a link between the two districts of Mons City Center and the Grands Prés site. This gallery includes business spaces and offices (+/- 2500 m²).
Hart Van Zuid International Conference Center (The Netherlands)
Project Location: Ahoi 10 road Rotterdam, Netherlands
Project Definition: Construction of Conference Center
Owner: Hart Van Zuid
Contractor: Ballast Nedam, Heijmans
Duration: 12 Months / 2018 - 2019
Scope of Work: -Execution of Formwork;
-Concrete placement of Precast units (25.000sqm).
Project Definition: Construction of Conference Center
Owner: Hart Van Zuid
Contractor: Ballast Nedam, Heijmans
Duration: 12 Months / 2018 - 2019
Scope of Work: -Execution of Formwork;
-Concrete placement of Precast units (25.000sqm).
Renaissance Hotel (The Netherlands)
Project Location: Amsterdam / The Netherlands
Project Definition: Hotel Construction
Owner: International Hotel Capital Partners
Contractor: Pieters Bouwtechniek
Duration: 5 months /2018
Scope of Works: Desa scope covers the execution of brickworks of Renaissance Hotel.
Project Definition: Hotel Construction
Owner: International Hotel Capital Partners
Contractor: Pieters Bouwtechniek
Duration: 5 months /2018
Scope of Works: Desa scope covers the execution of brickworks of Renaissance Hotel.
Weespersluis (The Netherlands)
Project Location: Weesp / The Netherlands
Project Definition: Residential Construction
Contractor: Van Wijnen
Duration: 6 months /2018
Scope of Works: Desa scope covers the execution of brickworks of Weespersluis residential units.
Project Definition: Residential Construction
Contractor: Van Wijnen
Duration: 6 months /2018
Scope of Works: Desa scope covers the execution of brickworks of Weespersluis residential units.
Badeparadies Schwarzwald Titisee (Germany)
Project Location: Titisee-Neustadt / Germany
Project Definition: Erection of Steel Structure and Glazing
Owner: Wund Gmbh.
Contractor: Desa
Duration: 8 months / 2016
Scope of Work: Desa scope covers design, supply and erection of the steel structure, glazing, trapezoidal sheet and closings. Badeparadies Schwarzwald is a spa and a water paradise developed in 2 sections: “PALAIS VITAL”- a tropical oasis in the heart of the black forest and “GALAXY”- one of the largest and most modern water slide complexes in Germany.
Project Definition: Erection of Steel Structure and Glazing
Owner: Wund Gmbh.
Contractor: Desa
Duration: 8 months / 2016
Scope of Work: Desa scope covers design, supply and erection of the steel structure, glazing, trapezoidal sheet and closings. Badeparadies Schwarzwald is a spa and a water paradise developed in 2 sections: “PALAIS VITAL”- a tropical oasis in the heart of the black forest and “GALAXY”- one of the largest and most modern water slide complexes in Germany.
Embassy Of The United States (The Netherlands)
Project Location: Wassenaar / The Netherlands
Project Definition: Embassy of the United States of America
Owner: U.S. Bureau of Overseas Building Operations
Contractor: Caddel Construction Co. (DE), LLC.
Duration: 36 months / 2014-2017
Scope of Work: The New Embassy Campus is situated on 10 acres of land and includes an office building, a US marine corps residence, a utility building and multiple access pavilions. It is an environmentally sustainable platform for diplomacy in the Hague. Desa scope covers the management and execution of the structural works of approximately 14,500 m³ concrete, 1,550 tons rebar, 45,000 m² formwork, as well as the management and execution of architectural works of 10,000 m² brick wall, 2,700 m² stone & metal cladding, 2,800 m² glass, 8,000 m² carpet-porcelain-stone flooring, 5,000 m² suspended ceiling, 12,000 m² drywall and 7,000 m² waterproofing works.
Project Definition: Embassy of the United States of America
Owner: U.S. Bureau of Overseas Building Operations
Contractor: Caddel Construction Co. (DE), LLC.
Duration: 36 months / 2014-2017
Scope of Work: The New Embassy Campus is situated on 10 acres of land and includes an office building, a US marine corps residence, a utility building and multiple access pavilions. It is an environmentally sustainable platform for diplomacy in the Hague. Desa scope covers the management and execution of the structural works of approximately 14,500 m³ concrete, 1,550 tons rebar, 45,000 m² formwork, as well as the management and execution of architectural works of 10,000 m² brick wall, 2,700 m² stone & metal cladding, 2,800 m² glass, 8,000 m² carpet-porcelain-stone flooring, 5,000 m² suspended ceiling, 12,000 m² drywall and 7,000 m² waterproofing works.
East Village Jump Factory, London (U.K.)
Project Location: East Village, London / U.K.
Project Definition: Erection of Steel Structure
Owner: Mace
Contractor: Metal Yapi
Duration: 4 months/ 2017
Scope of Work: Desa scope covers erection of 750 tons of steel structure. The project aims to construct two high rise residential towers using a new concept in the U.K. market. The scheme uses a temporary steel rising factory erected over the top of each residential tower during the construction. After each floor has been constructed, the temporary steel 'rising factory' is lifted, allowing the next floor to be built.
Project Definition: Erection of Steel Structure
Owner: Mace
Contractor: Metal Yapi
Duration: 4 months/ 2017
Scope of Work: Desa scope covers erection of 750 tons of steel structure. The project aims to construct two high rise residential towers using a new concept in the U.K. market. The scheme uses a temporary steel rising factory erected over the top of each residential tower during the construction. After each floor has been constructed, the temporary steel 'rising factory' is lifted, allowing the next floor to be built.
Embassy Of The United States Ashgabat (Turkmenistan)
Project Location: Ashgabat / Turkmenistan
Project Definition: Embassy of the United States of America
Owner: U.S. Bureau of Overseas Building Operations
Contractor: Caddell Construction Co., Inc.
Duration: 12 months/2015-2016
Scope of Work: Desa scope covers design and build of a new U.S. Embassy compound to include a new office building, U.S. Marine residence, american cultural center, a warehouse, a recreational facility and staff residences, including residences for the chief of mission and deputy chief of mission.The project is located on a 17-acre land just outside the city of Ashgabat in a very high profile district.
Project Definition: Embassy of the United States of America
Owner: U.S. Bureau of Overseas Building Operations
Contractor: Caddell Construction Co., Inc.
Duration: 12 months/2015-2016
Scope of Work: Desa scope covers design and build of a new U.S. Embassy compound to include a new office building, U.S. Marine residence, american cultural center, a warehouse, a recreational facility and staff residences, including residences for the chief of mission and deputy chief of mission.The project is located on a 17-acre land just outside the city of Ashgabat in a very high profile district.
WESTFIELD SHOPPING CENTER LONDON, ENGLAND
PROJECT LOCATION: London, ENGLAND
PROJECT DEFINITION: Construction of Shopping Mall
OWNER: Westfield Group
CONTRACTOR: Metal Yapi
DURATION: 11 Months / 2017-2018
SCOPE OF WORK: Erection of Structural Steel, installation of suspended ceiling and facade.
PROJECT DEFINITION: Construction of Shopping Mall
OWNER: Westfield Group
CONTRACTOR: Metal Yapi
DURATION: 11 Months / 2017-2018
SCOPE OF WORK: Erection of Structural Steel, installation of suspended ceiling and facade.
Badeparadies Euskirchen I (Germany)
Project Location: Euskirchen / Germany
Project Definition: Recreation Center
Owner: WUND GmbH
Contractor: Metal Yapi GmbH
Duration: 3 months /2019
Scope of Works: Desa scope covers the design, fabrication and erection of 2 sliding roofs, approximately 65 tons of steel structure. The domed roofs are designed as a single layer grid system with a peripheral ring beam. Badeparadies Euskirchen is the largest and the most diverse holiday paradise which arises on the threshold between the Rhineland and Eiffel on an area of more than 18000m².
Project Definition: Recreation Center
Owner: WUND GmbH
Contractor: Metal Yapi GmbH
Duration: 3 months /2019
Scope of Works: Desa scope covers the design, fabrication and erection of 2 sliding roofs, approximately 65 tons of steel structure. The domed roofs are designed as a single layer grid system with a peripheral ring beam. Badeparadies Euskirchen is the largest and the most diverse holiday paradise which arises on the threshold between the Rhineland and Eiffel on an area of more than 18000m².
BADEPARADIES EUSKIRCHEN II (GERMANY)
Project Location: Euskirchen / Germany
Project Definition: Recreation Center
Owner: WUND GmbH
Contractor: Metal Yapi GmbH
Duration: 3 months /2015
Scope of Works: Additional steel structure of 50 tons, trapezoidal sheet supply and installation of glass facade.
Project Definition: Recreation Center
Owner: WUND GmbH
Contractor: Metal Yapi GmbH
Duration: 3 months /2015
Scope of Works: Additional steel structure of 50 tons, trapezoidal sheet supply and installation of glass facade.
Erding Therme (Germany)
Project Location: Munich/Germany
Project Definition: Recreation Center
Owner: Roschmann Konstruktionen Aus Stahl Und Glas GmbH
Contractor: Metal Yapi GmbH
Duration: 3 months / 2014
Scope of Work: Desa scope covers supply of structural steel and erection works.
Project Definition: Recreation Center
Owner: Roschmann Konstruktionen Aus Stahl Und Glas GmbH
Contractor: Metal Yapi GmbH
Duration: 3 months / 2014
Scope of Work: Desa scope covers supply of structural steel and erection works.
European Central Bank-LOS4 (Germany)
Project Location: Frankfurt/Germany
Project Definition: European Central Bank
Owner: Roschmann Konstruktionen Aus Stahl Und Glas GmbH
Contractor: Roschmann Gmbh
Duration: 3 months / 2014
Scope of Work: Desa scope covers supply of entire structural steel in addition to the erection works.
Project Definition: European Central Bank
Owner: Roschmann Konstruktionen Aus Stahl Und Glas GmbH
Contractor: Roschmann Gmbh
Duration: 3 months / 2014
Scope of Work: Desa scope covers supply of entire structural steel in addition to the erection works.
AXA New Headquarters (Belgium)
Project Location: Brussels / Belgium
Project Definition: Office Complex
Owner: Axa
Contractor: Cit-Blaton, Metal Yapi
Duration: 6 months / 2015-2016
Scope of Work: Desa scope covers the entire façade works.
Project Definition: Office Complex
Owner: Axa
Contractor: Cit-Blaton, Metal Yapi
Duration: 6 months / 2015-2016
Scope of Work: Desa scope covers the entire façade works.
Residence Palace (Belgium)
Project Location: Brussels / Belgium
Project Definition: Erection of Steel Structure
Owner: Conseil Europeen Et Consel De L’U.E.
Contractor: International Metal Works
Duration: 6 months / 2012-2013
Scope of work: Desa scope covers the erection and welding of the steel structure.
Project Definition: Erection of Steel Structure
Owner: Conseil Europeen Et Consel De L’U.E.
Contractor: International Metal Works
Duration: 6 months / 2012-2013
Scope of work: Desa scope covers the erection and welding of the steel structure.
Louise Center (Belgium)
Project Location: Brussels / Belgium
Project Definition: Façade Cladding Works
Client: Metal YAPI SA/NV
Duration: 8 months / 2012
Scope of Work: Desa scope covers the façade cladding works.
Project Definition: Façade Cladding Works
Client: Metal YAPI SA/NV
Duration: 8 months / 2012
Scope of Work: Desa scope covers the façade cladding works.
The Capital/European Union Commission Building (Belgium)
Project Location: Brussels / Belgium
Project Definition: Erection of Steel Structure
Owner: AXA
Contractor: Metal YAPI SA/NV
Duration: 4 months / 2012
Scope of Work: Desa scope covers 250m² steel skylight and glazing installation.
Project Definition: Erection of Steel Structure
Owner: AXA
Contractor: Metal YAPI SA/NV
Duration: 4 months / 2012
Scope of Work: Desa scope covers 250m² steel skylight and glazing installation.
Hotel de Police (Belgium)
Project Location: Brussels / Belgium
Project Definition: Façade Cladding Works
Client: Metal YAPI SA/NV
Duration: 8 months / 2012
Scope of Work: Desa scope covers the façade cladding works.
Project Definition: Façade Cladding Works
Client: Metal YAPI SA/NV
Duration: 8 months / 2012
Scope of Work: Desa scope covers the façade cladding works.
AA Tower (Belgium)
Project Location: Brussels / Belgium
Project Definition: Erection of Steel Structure
Owner: AXA
Contractor: Metal YAPI SA/NV
Duration: 4 months / 2012
Scope of Work: Desa scope covers 250m² steel skylight and glazing installation.
Project Definition: Erection of Steel Structure
Owner: AXA
Contractor: Metal YAPI SA/NV
Duration: 4 months / 2012
Scope of Work: Desa scope covers 250m² steel skylight and glazing installation.
Lazika Sculpture (Georgia)
Project Location: Lazika / Georgia
Project Definition: Art and Sculpture
Client: State of Georgia
Contractor: Eng Metal Yapi
Duration: 4 months / 2012
Scope of Work: DESA scope covers engineering, procurement, and fabrication management as well as coordination of design and execution of site works. "Lazika Sculpture" consists of 330 tons of structural steel fully connected by welding. The 30 meters tall sculpture is designed by Knippers Helbig to be the prominent symbol of the city.
Project Definition: Art and Sculpture
Client: State of Georgia
Contractor: Eng Metal Yapi
Duration: 4 months / 2012
Scope of Work: DESA scope covers engineering, procurement, and fabrication management as well as coordination of design and execution of site works. "Lazika Sculpture" consists of 330 tons of structural steel fully connected by welding. The 30 meters tall sculpture is designed by Knippers Helbig to be the prominent symbol of the city.
Hotel Hilton (Georgia)
Project Location: Batumi / Georgia
Project Definition: Hotel Construction
Owner: Tour Invest
Contractor: Mace, Metal Yapi
Duration: 6 months / 2013
Scope of Work: Desa scope covers the design study, material supply and procurement management, fabrication management and site execution works including various fire resistance coating systems. The project is conceptually projected as a composite structure with 540 tons of structural steel. Hilton Hotel is designed to be a 5 star hotel with luxury apartments.
Project Definition: Hotel Construction
Owner: Tour Invest
Contractor: Mace, Metal Yapi
Duration: 6 months / 2013
Scope of Work: Desa scope covers the design study, material supply and procurement management, fabrication management and site execution works including various fire resistance coating systems. The project is conceptually projected as a composite structure with 540 tons of structural steel. Hilton Hotel is designed to be a 5 star hotel with luxury apartments.
Respublika Mixed-Use Complex (Ukraine)
Project Location: Kiev/ Ukraine
Project Definition: Shopping Mall
Client: K.A.N. Development
Contractor: Metal Yapi
Duration: 4 months / 2013
Scope of work: Desa scope covers the design study, procurement management, and material supply as well as fabrication of the spatial steel structures of the 3 entrances of the complex.
Project Definition: Shopping Mall
Client: K.A.N. Development
Contractor: Metal Yapi
Duration: 4 months / 2013
Scope of work: Desa scope covers the design study, procurement management, and material supply as well as fabrication of the spatial steel structures of the 3 entrances of the complex.
Skanska Green Court Bucharest (Romania)
Project Location: Bucharest / Romania
Project Definition: Office Complex
Owner: Skanska Investment
Contractor: Skanska Construction
Duration: 6 months / 2013
Scope of Work: Desa scope covers the structural works of underground floors of this A class office building.
Project Definition: Office Complex
Owner: Skanska Investment
Contractor: Skanska Construction
Duration: 6 months / 2013
Scope of Work: Desa scope covers the structural works of underground floors of this A class office building.
Cet Turceni Desulphaurization Plant Steel Structure Erection (Romania)
Project Location: Turceni-Craiova / Romania
Project Definition: Infrastructure and Industrial Construction
Owner: CET Turceni
Contractor: Austrian Energy & Environment-TMUCB
Duration: 18 months / 2010-2012
Scope of Work: Desa scope covers the erection of 2500 tons of structural steel for the project.
Project Definition: Infrastructure and Industrial Construction
Owner: CET Turceni
Contractor: Austrian Energy & Environment-TMUCB
Duration: 18 months / 2010-2012
Scope of Work: Desa scope covers the erection of 2500 tons of structural steel for the project.
Cet Turceni Desulphaurization Plant Structural Concrete Works (Romania)
Project Location: Turceni-Craiova / Romania
Project Definition: Infrastructure and Industrial Construction
Owner: Austrian Energy & Environment-TMUCB
Contractor: Skanska Construction SRL
Duration: 12 months / 2010-2011
Scope of Work: Desa scope covers the execution of all pipe rack foundations (284 pieces), including the topographic services, anchorage application and grouting, execution of processed water building, and limestone electrical building as well as limestone unloading structure.
Project Definition: Infrastructure and Industrial Construction
Owner: Austrian Energy & Environment-TMUCB
Contractor: Skanska Construction SRL
Duration: 12 months / 2010-2011
Scope of Work: Desa scope covers the execution of all pipe rack foundations (284 pieces), including the topographic services, anchorage application and grouting, execution of processed water building, and limestone electrical building as well as limestone unloading structure.
Cet Turceni Concentrators Block 5 and 6 (Romania)
Project Location: Turceni-Craiova / Romania
Project Definition: Infrastructure and Industrial Construction
Owner: CET
Contractor: Romelectro S.A. - Energoconstructia S.A.
Duration: 3 months / 2011
Scope of Work: Desa scope covers execution of reinforced concrete structure and material procurement.
Project Definition: Infrastructure and Industrial Construction
Owner: CET
Contractor: Romelectro S.A. - Energoconstructia S.A.
Duration: 3 months / 2011
Scope of Work: Desa scope covers execution of reinforced concrete structure and material procurement.
Autostrada Transylvania project (Romania)
Project Location: Oradea / Romania
Project Definition: Transportation and Infrastructure
Owner: National Company of Highways and National Roads of Romania S.A.
Contractor: Bechtel International Inc. SRL
Duration: 3 months/2012
Scope of Work: Desa scope covers the execution of reinforced concrete works of the overpasses at km 42+748, 48+394, 56+960
Project Definition: Transportation and Infrastructure
Owner: National Company of Highways and National Roads of Romania S.A.
Contractor: Bechtel International Inc. SRL
Duration: 3 months/2012
Scope of Work: Desa scope covers the execution of reinforced concrete works of the overpasses at km 42+748, 48+394, 56+960
Lidl Store (Romania)
Project Location: Ploesti / Romania
Project Definition: Erection of Steel Structure
Client: Lidl Romania
Contractor: Synergy Construct SRL
Duration: 4 months (2011/2012)
Scope of Work: Desa scope covers steel structure supply, fabrication management, design coordination and site execution works.
Project Definition: Erection of Steel Structure
Client: Lidl Romania
Contractor: Synergy Construct SRL
Duration: 4 months (2011/2012)
Scope of Work: Desa scope covers steel structure supply, fabrication management, design coordination and site execution works.
REHABILITATION WORKS OF WWTP IN MEDIAS (ROMANIA)
PROJECT LOCATION: Medias, Sibiu, ROMANIA
PROJECT DEFINITION: Rehabilitation works of waste water treatment plant
OWNER: ApaNova
CONTRACTOR: Hochtief Solutions A.G.
DURATION: 3 Months / 2012
SCOPE OF WORK: Erection and Procurement of Structural Steel.
PROJECT DEFINITION: Rehabilitation works of waste water treatment plant
OWNER: ApaNova
CONTRACTOR: Hochtief Solutions A.G.
DURATION: 3 Months / 2012
SCOPE OF WORK: Erection and Procurement of Structural Steel.
Galaxy Tower (The Netherlands)
Project Location: Utrecht / The Netherlands
Project Definition: Hotel and Residential Construction
Owner: SPF Beheer
Contractor: Ballast Nedam
Duration: 7.5 months /2019
Scope of Works: Desa scope covers the execution of formwork, concrete casting, and placement of precast units.
Project Definition: Hotel and Residential Construction
Owner: SPF Beheer
Contractor: Ballast Nedam
Duration: 7.5 months /2019
Scope of Works: Desa scope covers the execution of formwork, concrete casting, and placement of precast units.
Campus 6 - Phase || & ||| (Romania)
Project Location: Bucharest (Romania)
Project Definition: Construction of 2 Office Buildings A Class
Owner: Construction of 2 Office Buildings A Class
Contractor: Desa
Duration: 18 Months / 2019 - 2020
Scope of Work: - Execution of Reinforced Concrete works: 33,000 mc cast in situ
- Supply and installation of Façade works: 15,000 sqm of Unitized and Classical Curtain wall facade
Project Definition: Construction of 2 Office Buildings A Class
Owner: Construction of 2 Office Buildings A Class
Contractor: Desa
Duration: 18 Months / 2019 - 2020
Scope of Work: - Execution of Reinforced Concrete works: 33,000 mc cast in situ
- Supply and installation of Façade works: 15,000 sqm of Unitized and Classical Curtain wall facade
AHOY International Convention Center (The Netherlands)
Project Location: Rotterdam / The Netherlands
Project Definition: Entertainment and Cultural Center
Owner: Hart van Zuid
Contractor: Ballast Nedam, Heijmans
Duration: 14 Months / 2018 – 2019
Scope of Works: Desa scope covers the execution of formwork; concrete casting, and placement of precast units (25,000 m²).
Project Definition: Entertainment and Cultural Center
Owner: Hart van Zuid
Contractor: Ballast Nedam, Heijmans
Duration: 14 Months / 2018 – 2019
Scope of Works: Desa scope covers the execution of formwork; concrete casting, and placement of precast units (25,000 m²).