Project Location: Euskirchen / Germany Project Definition: Recreation Center Owner: WUND GmbH Contractor: Metal Yapi GmbH Duration: 3 months /2019 Scope of Works: Desa scope covers the design, fabrication and erection of 2 sliding roofs, approximately 65 tons of steel structure. The domed roofs are designed as a single layer grid system with a peripheral ring beam. Badeparadies Euskirchen is the largest and the most diverse holiday paradise which arises on the threshold between the Rhineland and Eiffel on an area of more than 18000m². |